Objects
JSC YAROSLAVL ELECTRIC MACHINE PLANT (JSC ELDIN)
Industry sector: Metallurgy and mechanical engineering
Project: Mounting of the induction furnace
Site location: Yaroslavl
Terms of the work completion on site: March, 2007 - July, 2008
The description of the performed works:
Dismantling of the equipment, set of works on mounting of the ABP induction furnace with a productivity rate of 3 t/hour, set of general construction and repair works. The works were conducted under the chief mounting of the German specialist.
- 200 tons of dismantled equipment,
- 70 tons of the manufactory equipment,
- 300 m³ of concrete,
- 1150 m of process pipelines,
- 48 tons of metalwork,
- 33 tons of operating platforms.