JSC YAROSLAVL ELECTRIC MACHINE PLANT (JSC ELDIN)

Industry sector: Metallurgy and mechanical engineering

Project: Mounting of the induction furnace

Site location: Yaroslavl

Terms of the work completion on site: March, 2007 - July, 2008

The description of the performed works:

Dismantling of the equipment, set of works on mounting of the ABP induction furnace with a productivity rate of 3 t/hour, set of general construction and repair works. The works were conducted under the chief mounting of the German specialist.

 

  • 200 tons of dismantled equipment,
  • 70 tons of the manufactory equipment,
  • 300 m³ of concrete,
  • 1150 m of process pipelines,
  • 48 tons of metalwork,
  • 33 tons of operating platforms.

 

 