Objects
BLOOD PLASMA TRANSFORMATION PLANT
Industry sector: Pharmaceutical industry
Project: The construction of the plant power center with a planned annual output of 600 tons of transformed blood plasma
Site location: Kirov
Terms of the work completion on site: October, 2009 - December, 2011
The description of the performed works:
- 3 boilers with the hourly output of 30 tons of steam,
- 6 200 m of industrial pipeline,
- 3 100 m of cables,
- 1 300 square meters of insulation,
- 23 tons of metal construction.